By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Africa Housing NewsAfrica Housing News
Notification Show More
Aa
  • Home
  • News
  • Real Estate News
  • Nigeria Property News
  • Join Us
    • About Us
    • Contact Us
    • Join Us
Reading: Cost of Building a 3 Bedroom Bungalow in Nigeria 2021 (Updated)
Share
Aa
Africa Housing NewsAfrica Housing News
  • Home
  • News
  • Real Estate News
  • Nigeria Property News
  • Join Us
Search
  • Home
  • News
  • Real Estate News
  • Nigeria Property News
  • Join Us
    • About Us
    • Contact Us
    • Join Us
Have an existing account? Sign In
Follow US
Africa Housing News > Blog > News > Cost of Building a 3 Bedroom Bungalow in Nigeria 2021 (Updated)
News

Cost of Building a 3 Bedroom Bungalow in Nigeria 2021 (Updated)

Fesadeb
Last updated: 2021/04/25 at 12:25 PM
Fesadeb Published April 25, 2021
Share
SHARE

Do you want to know the cost of building a 3 bedroom bungalow in Nigeria? This article is for you. So many people visit the web to know the cost of building a 3 bedroom bungalow in Nigeria but get disappointed most of the time. Only a few articles exist on the subject topic and rarely have details. In this article, you would get full details on the cost of building a 3 bedroom bungalow in Nigeria.

Contents
Cost of Building a 3 Bedroom Bungalow in Nigeria 2021Cost of Foundation (German Floor) / Soak-away StageMaterial Requirements for Setting-out with profilesMaterial Requirements for Digging / ExcavationMaterial Requirements for Concrete work / BlindingMaterial Requirements for Laying Foundation BlocksMaterial Requirements for FillingMaterial Requirements for Foundation Casting / FlooringMaterial Requirements for Septic Tank, Soak-away pit and WellCost of Construction From Damp Proof Course (D.P.C) To Lintel LevelMaterial Requirements and Labour for Block workMaterial Requirement for Lintel CastingCost of Roofing 3 Bedroom Bungalow StageMaterial Requirements for RoofingCost of Finishing StageMaterial Requirements for Electrical worksMaterial Requirements for CeilingMaterial Requirements for Windows and DoorsMaterial Requirements for Wall Rendering and PaintingMaterial Requirements for Floor Finishes

Most times when people hear the cost of building a 3 bedroom bungalow in Nigeria from friends, they get scared. The cost they get to hear, run into tens of millions at some point. Honestly, you can build a 3 bedroom bungalow for as much as N50,000,000, or as low as N5,000,000. Sometimes the estimate even goes below the latter. This cost is affected by a number of factors ranging from:

  • Location of the property.
  • Cost of building materials.
  • Quality of building materials.
  • Charges of professionals as it varies.

It may cost you more when building your own 3 bedroom bungalow but below is the estimated cost for a standard 3 bedroom bungalow in Nigeria. The breakdown involves the cost of the actual construction and not the preliminaries to the construction.

Before you begin construction, you must have acquired a piece of land. See DOCUMENTS REQUIRED FOR LAND PURCHASE IN NIGERIA. Also, before the construction process, are steps needed to be taken in building a house in Nigeria. These steps involve architects and related building engineers. Look at the processes for BUILDING A HOUSE IN NIGERIA.

Table of Contents

  • Cost of Building a 3 Bedroom Bungalow in Nigeria 2021
    • Cost of Foundation (German Floor) / Soak-away Stage
    • Material Requirements for Setting-out with profiles
      • Material Requirements for Digging / Excavation
      • Material Requirements for Concrete work / Blinding
      • Material Requirements for Laying Foundation Blocks
      • Material Requirements for Filling
      • Material Requirements for Foundation Casting / Flooring
      • Material Requirements for Septic Tank, Soak-away pit and Well
    • Cost of Construction From Damp Proof Course (D.P.C) To Lintel Level
      • Material Requirements and Labour for Block work
      • Material Requirement for Lintel Casting
    • Cost of Roofing 3 Bedroom Bungalow Stage
      • Material Requirements for Roofing
    • Cost of Finishing Stage
      • Material Requirements for Electrical works
      • Material Requirements for Ceiling
      • Material Requirements for Windows and Doors
      • Material Requirements for Wall Rendering and Painting
      • Material Requirements for Floor Finishes

Cost of Building a 3 Bedroom Bungalow in Nigeria 2021

Before you dig earth, make sure you have all required APPROVED documents for the construction process, viz a viz:

  • Architectural drawings.
  • Structural drawings.
  • Mechanical drawings.
  • Electrical drawings.

Some people break earth without some of these drawings and hope everything turns out fine. That is a wrong mentality. Please follow the right process.

In calculating the cost of building a 3 bedroom bungalow in Nigeria, it is advisable to breakdown the construction process into stages. This is the norm and is actually helpful in planning your progress. For a bungalow, we can split the construction stages into:

  • Foundation (German floor) / Soak-away Stage.
  • DPC to lintel level Stage.
  • Roofing Stage.
  • Plastering / Finishing Stage.

Cost of Foundation (German Floor) / Soak-away Stage

This is the first stage of construction and it includes setting out, digging, concrete work, block laying, backfilling, and flooring as the processes in this stage.

Material Requirements for Setting-out with profiles

  • 4 pieces of 1 x 12 plank @ NGN 1,200 each plus NGN 800 (for dividing each into 5 (@ NGN 200 each) = NGN 5,600
  • 4 bundles of Pegs @ NGN 1,200 each = NGN 4,800
  • 2″ and 3″ Nails = NGN 1,200 worth of nails
  • 4 bundles of rope @ NGN 200 each = NGN 800
  • Labour = NGN 5,000

Estimated cost of setting-out = NGN 17,400.

Material Requirements for Digging / Excavation

  • We will need some diggers and shovels for the job. These tools can cost about NGN 2,000 to rent.
  • Labour = NGN 10,000

Estimated cost of digging = NGN 12,000.

Material Requirements for Concrete work / Blinding

For a standard foundation of 150 mm base-thickness, assuming 0.45m (breadth or height) and 85.5m (entire length) = 5.77125 m3

  • 10 bags of cement @ NGN 4,600 each = NGN 46,000
  • 20 tonnes of sand x 2 = NGN 80,000
  • 20 tonnes of Granite = NGN 140,000
  • We don’t need reinforcements (Iron bars) because the soil is good, firm, and dry.
  • Liters of water as needed.
  • Labour = NGN 25,000

The estimated cost of concrete work = NGN 291,000.

Material Requirements for Laying Foundation Blocks

Using 9-inch blocks and laying 4 coaches, you will need

  • 12 bags of cement @ NGN 4,600 each = NGN 55,200
  • 644 pieces of 9-inch vibrated blocks (including 10 percent wastage) @ NGN 200 each = NGN 128,800
  • Plumbing work = NGN 25,000
  • The remaining sand from concrete work will be used here.
  • Labour = NGN 35,000

The estimated cost of laying foundation blocks = NGN 244,000.

Material Requirements for Filling

I suggest digging the soak-away and septic tank alongside making the foundation so that the soil dug up from the soak-away pit, septic tank, and well can be used for backfilling. This will save you the cost of buying some tons of sand for foundation filling and also save you the cost of clearing the dug-up soil where it is unused.

After filling the foundation, water it for about 10 hours and leave it for days (or some weeks) before flooring for natural compaction. In the end, you might need to buy just a few tons of sand if the soil dug up from the well and septic tank is not enough.

Assuming you buy:

  • 3 nos 20 tonnes laterite (fairly clayey) at NGN 18,000 = NGN 54,000
  • Labour = NGN 10,000

Estimated cost of filling foundation = NGN 64,000

Material Requirements for Foundation Casting / Flooring

  • 25 bags of cement @ NGN 4,600 = NGN 115,000
  • Waterproof / nylon = NGN 15,000
  • The remaining granite and sand from concrete work will be used here.
  • Labour = NGN 18,000

Estimated cost of flooring = NGN 148,000

Material Requirements for Septic Tank, Soak-away pit and Well

The septic tank, soak-away pit, and well should be constructed first in order to have water for the work and sand for filling the foundation later.

  • 700 pieces of 6-inch vibrated blocks @ NGN 170 / block (for a septic tank of 3m x 3m x 3m) = NGN 119,000.
  • 22 bags of cement @ NGN 4,600 = NGN 101,200 (including plastering).
  • Number of well-rings as required.
  • Sand and granite from concrete work will be used here.
  • Labor for septic tank, soak-away pit, and well = NGN 80,000

The estimated cost of constructing both the septic tank, soak-away, and well = NGN 300,200.

Total Estimated Cost for this stage = NGN 1,076,600 (excluding the cost of wellrings).

Cost of Construction From Damp Proof Course (D.P.C) To Lintel Level

This is the next stage in the construction process and begins where the German floor ends. It covers the main block work including wall partitions for the various spaces in the house. The materials listed below are just estimates of what you get in a modest 3-bedroom flat. Again, ensure you get a Bill of Quantities for your building plan as that’s the only way to know the exact material requirements for your house. This stage ends at the roof level.

Material Requirements and Labour for Block work

  • 2100pcs of 6-inch stone dust vibrated blocks @ NGN 170 = NGN 357,000.
  • (The cost increases when you use 9-inch blocks)
  • 15 tonnes of sharp sand = NGN 40,000
  • 30 bags of cement @ NGN 4,600 = NGN 138,000
  • Labour = NGN 120,000

Estimated cost of block work = NGN 655,000. (This includes the two coaches of blocks after lintel)

Material Requirement for Lintel Casting

  • 20 length of 12mm rod @ NGN 2,100 / length = NGN 42,000
  • 10 length of stirrups @ NGN 500 / length = NGN 5,000
  • 35 length of 1 x 12 x 18 wood @ NGN 1,700 / length = NGN 59,500
  • Nails plus wire for binding = NGN 13,000
  • 8 bags of cement @ NGN 4,600 = NGN 36,800
  • Remaining sand will be used here.
  • The remaining granite from concrete work is used.
  • Labour plus carpenter = NGN 30,000

The estimated cost of the lintel level = NGN 186,300

Estimated Total Cost for this stage = NGN 841,300.

Cost of Roofing 3 Bedroom Bungalow Stage

The cost of roofing varies with the type of roofing materials and design you choose to use. The cost given below represents 0.45 mm thick aluminum roofing sheets. The true cost of all stages remains that shown on the bill of quantity document.

Material Requirements for Roofing

  • 320 length of 2 x 3 x 12 wood @ NGN 450 = NGN 144,000
  • 45 length of 2 x 6 x 12 @ NGN 840 = NGN 38,250
  • 25 length of 1 x 12 x 12 wood @ NGN 1,400 = NGN 35,000
  • 1/2 bag of 2-inch nails @ NGN 5,800 = NGN 2,900
  • 11/2 bags of 3-inch nails @ NGN 6,000 = NGN 9,000
  • 1/2 bag of 4-inch nails @ NGN 6,500 = NGN 3,250
  • Aluminium (0.45mm thick) roofing, transportation and Labour = NGN 685,900

Total Estimated Cost for the roofing stage = NGN 918,300.

Cost of Finishing Stage

This stage includes plastering, wiring, plumbing, fixing of windows, doors, tiles, and other essentials. The cost here varies regarding the quality of materials you use. Below is an estimate for a very modest finishing.

Material Requirements for Electrical works

  • Wires, Pipes, Conduit Boxes, etc = NGN 400,000
  • Material Requirements for Mechanical and Plumbing Works
  • Kitchen sink, Pipes, WC, Washing Hand Basin, Overhead Tank, Shower, etc = NGN 500,000

Material Requirements for Ceiling

  • Woods for nogging, P.O.P Sheets, External wood finishing, P.V.C Boards, Tank nails, etc plus labor = NGN 450,000

Material Requirements for Windows and Doors

  • Windows, doors, burglary proof, and fixtures plus labor = NGN 500,000

Material Requirements for Wall Rendering and Painting

  • Plastering and painting plus labor = NGN 500,000

Material Requirements for Floor Finishes

  • Tiles and others plus labor = NGN 250,000

Estimated Total Cost for this stage = NGN 2,600,000.

Grand Total = NGN 1,076,600 + NGN 841,300 + NGN 918,300 + NGN 2,600,000 = NGN 5,436,200

As you can see from the calculations, we arrived at a total cost of building a 3 bedroom bungalow which is below NGN 6,000,000. This involves just the construction of the 3 bedroom bungalow in Nigeria. As for the furniture fittings, you have a variety of options you can choose from. Also, clearing the site after the construction was not factored into the cost. However, the amount is not so much when put into the cost of building a 3 bedroom bungalow in Nigeria.

If you make plans, the cost of building a 3 bedroom bungalow would be reduced to the barest minimum. All it takes is for you to follow the procedures laid out above.


Do you have a project and you want us to help you manage it, you can contact us HERE.

If you also need a bill of quantity for your project, write to us HERE anytime.

Do you need an architect to produce an affordable design for your next project, also contact us.

Source: The Architect

You Might Also Like

SDP Zonal Chairman in Kaduna Dies in Road Crash

Swift Action by Oyo Firefighters Prevents Petrol Tanker Explosion

Dowen College Graduates Earn Multi-Million Dollar Scholarships to Study Abroad

Wike Declares End to Rivers Political Crisis, Vows Loyalty to PDP

Tinubu Urges Nigerians in Saint Lucia to Uphold Host Country’s Laws

Join Our Whatsapp Group

Contact Image

Join Our WhatsApp Channel

Housing TV Africa is the First Housing News Television
in Africa on Startimes Channel 149 bringing you
Housing News, Mortgage News, Construction News etc

TAGGED: nigeria
Fesadeb April 25, 2021 April 25, 2021
Share this Article
Facebook Twitter Email Print
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

© Africa Housing News. All Rights Reserved 2024

Welcome Back!

Sign in to your account

Lost your password?